• ohulancutash@feddit.uk
      link
      fedilink
      English
      arrow-up
      2
      ·
      edit-2
      4 days ago
      • No prior experience in building and operating high speed rail.

      • Track standards must be much higher.

      • Track must be completely secure from people and animals, and geology. This means high fences and shallow cuttings set far back from the running lines.

      • The line can only be crossed by bridges or tunnels. No level crossings.

      • Long distances pose issues in crew turnaround.

      • Track must be as straight and flat as possible. North America has space, but also has geography.

      • Reliable catenary power supply.