• ☆ Yσɠƚԋσʂ ☆@lemmy.mlOP
    link
    fedilink
    arrow-up
    0
    ·
    9 months ago

    There is no imminent threat from nuclear waste in Germany, and Germany has been operating reactors for a while now. So, the claim that all of a sudden it’s not possible to do because there’s no facility that’s up to your standards is just fear mongering. The reality is that Germany simply chooses not to build this facility. Also, maybe should read the links you post as it clearly contradicts your claim:

    In addition, the directive also provides for the possibility of transporting spent fuel and radioactive waste to other EU member states or third countries on the basis of bilateral agreements.

    • smegforbrains@lemmy.ml
      link
      fedilink
      arrow-up
      0
      ·
      edit-2
      9 months ago

      Thank you for trying to use arguments and sources.

      There seems to be another misunderstanding: The cited directive only allows for transportation of nuclear fuel to other EU member states or third party states for e.g. reprocessing. The responsibility for storing the nuclear waste lies with the producer:

      The directive is based on the general principle that ultimate responsibility for the safe disposal of spent fuel and radioactive waste lies with the Member States in whose territory these materials were generated. Specifically, the national framework to be drawn up by the member states must provide that the main responsibility for the disposal of these materials is in principle assigned to the producers. Member States must therefore ensure that anyone who has been granted authorization to carry out an activity related to waste disposal cannot shirk their associated responsibilities

      It’s the same source: https://www-base-bund-de.translate.goog/DE/base/bundesamt/aufbau/archiv/bfs-stellungnahmen/DE/2011/02-17-eu-richtlinie.html?_x_tr_sl=auto&_x_tr_tl=en&_x_tr_hl=en-US&_x_tr_pto=wapp)

      • ☆ Yσɠƚԋσʂ ☆@lemmy.mlOP
        link
        fedilink
        arrow-up
        0
        ·
        9 months ago

        What that says is that the responsibility of ensuring safe disposal lies with the states producing nuclear waste. It says nothing regarding where the waste is disposed as far as I can see. So, again, I don’t see anything here there precludes Germany from making a deal say with France to dispose of nuclear waste there while facilities are being built in Germany.

        Meanwhile, the risks of storing nuclear waste on the surface level are a result of unwillingness to build facilities to store nuclear waste underground. It is a self inflicted problem.