After maybe an hour of setting up blueprints for the inter-building walkways that I prototyped last time, I decided to actually start today by finalizing the Geothermal Generator here, and getting it fully connected to the main grid.

Then I went ahead and placed the first set of blueprints over at the main entrance, while I was nearby, to allow access to the logistics floor.

After that, I just headed over to where Crude Oil is coming into the first building, and started going crazy with getting buildings connected.

This here is the connections between the two buildings that are processing Crude Oil into Heavy Oil Residue. In order to fit the terrain, I ended up with one building of 3 Refineries, and one building of 6. So the first building consumes some of the Crude Oil, and passes the rest on to the next building, along with the Heavy Oil Reside and Polymer Resin that it did produce.

The next building receives them.

The one line of Heavy Oil Reside from the first building, plus 2 more from the second, trunk over to the Fuel processing building.

Meanwhile, Polymer Resin moves on to the waste waste processing and packaging building.

Waste processing also needs water, which comes from Fuel processing, which is also an adjacent building. One of these 3 lines is used to process all the Polymer Resin, and the other two will pass right under the building over to Compacted Coal.

There’s a pretty drastic height difference between the two buildings, so I added this little support strut for the pipes.

Slightly wider shot, from Fuel Processing.